Contract Win in Cambridgeshire
Location: Cambridgeshire Approximate size: 3250m2 Brief Project Description: RoofTech have been awarded the contract to replace the old asbestos-cement roof covering using Steadmans AS35 120mm thick composite panels. This will
10th October 2023
Contract Win in Kent
The existing 70m long box profile galvanised steel gutter to this factory unit in Kent was leaking due to failed joints and general deterioration. RoofTech have been awarded the contract
21st July 2023
Gutter Lining System – Project Completion
Our client in West Sussex was suffering from water ingress through deteriorated joints in their 82 metre long galvanised steel valley gutter. Following a site survey we specified a Plygene
1st February 2022
Gutter Lining Work in North London
Materials are being loaded onto the roof in preparation for Phase 2 of our gutter refurbishment programme at this food production factory in North London. After careful consideration, the Plygene
20th September 2021