Flat Roofing in Kent


Works are now complete at our site in Kent. RoofTech were awarded the contract to replace the PVC based single ply membrane with a new Danosa bituminous felt system which

29th July 2024

Contract Win in Kent


The existing 70m long box profile galvanised steel gutter to this factory unit in Kent was leaking due to failed joints and general deterioration. RoofTech have been awarded the contract

21st July 2023

Project Completion in Kent


Works are now complete at our site in Kent. The original covering to the flat roof had become brittle, which caused splitting and subsequent water ingress. RoofTech were awarded the

29th May 2023

Contract Win in Kent


Location: Kent Type: Office Block Size: 850m2 The existing single ply membrane covering to this flat roof has deteriorated, allowing water ingress in numerous locations. Patch repairs have been carried out using

21st November 2022

Flat-to-pitch roofing in Kent


RoofTech have now completed the flat-to-pitch transformation of our client’s failing asphalt flat roof in Dover, Kent . The lightweight galvanised steel framework was supplied by Dibsa Structures Ltd with

2nd September 2020

Flat-to-pitch roofing in Kent


The asphalt covered flat roof to our client’s office in Dover, Kent has had various treatments applied over the years in an attempt to stop water ingress. These treatments work

29th June 2020

Project Completed – Gravesend, Kent


We are pleased to bring you news of our latest completed project: Client Type: School Building type: Swimming Pool Location: Gravesend, Kent Approximate Size: 150m2 Brief Project Description:  RoofTech have

3rd September 2018

Gutter Refurbishment in Kent


Due to their coastal location, our client in Kent had suffered from severe rust corrosion to various valley gutters.               RoofTech designed and installed

19th December 2016

Dover Gutter Refurbishment


RoofTech were contacted by a client who had an issue where the corroded steel sheet had been cut back and a steel flashing installed to both sides of the existing valley