Project Secured in West Sussex
We are pleased to bring you news of our latest secured project: Location: West Sussex Approximate size: 2000m2 Brief Project Description: RoofTech have been awarded the contract to over-sheet this deteriorated
6th March 2023
Contract Win in Hampshire
We are pleased to bring you news of our latest secured project: Location: Hampshire Approximate size: 3500m2 Brief Project Description: RoofTech have been awarded the contract to over-sheet this deteriorated
13th February 2023
Contract Win in East Sussex
Location: East Sussex Approximate size: 900m2 Brief Project Description: RoofTech have been awarded the contract to replace the old double skin coated steel roof covering using new Kingspan KS1000RW QuadCore
15th August 2022
Project Win in Bedfordshire
We are pleased to bring you news of our latest secured project: Location: Bedfordshire Approximate size: 5000m2 Brief Project Description: RoofTech have been awarded the contract to over-sheet the deteriorated
8th August 2022
Gutter Refurbishment in Surrey
Customer: Warehouse in Surrey Defect: Ongoing problem with numerous leaks through the gutter Length: 110 linear metres Solution: Installation of new Fatra single ply membrane gutter lining system with all
25th April 2022
Project Completion – Gutter Lining System in East Sussex
Our client in East Sussex was suffering from water ingress through deteriorated joints in their galvanised steel valley gutter. Following a site survey we specified a Fatra single ply membrane
8th March 2022
Gutter Lining Work in North London
Materials are being loaded onto the roof in preparation for Phase 2 of our gutter refurbishment programme at this food production factory in North London. After careful consideration, the Plygene
20th September 2021
Gutter Refurbishment in Kent
Due to their coastal location, our client in Kent had suffered from severe rust corrosion to various valley gutters. RoofTech designed and installed
19th December 2016
Dover Gutter Refurbishment
RoofTech were contacted by a client who had an issue where the corroded steel sheet had been cut back and a steel flashing installed to both sides of the existing valley
4th January 2016