Latest news

Work in Progress – North London


Description of Works: Supply and installation of 120mm thick TATA Trisomet insulated composite panels to a new-build frame complete with insulated gutters and smoke vents. back to main news

4th October 2021

Project Completion in Bristol


We are pleased to announce completion of this roof replacement project in Bristol. The works involved replacement of the existing asbestos-cement roof covering using new Kingspan KS1000RW insulated composite panels

27th September 2021

Work in Progress – Middlesex


Works are progressing well to replace the old asbestos-cement roof covering using Joris Ide JI1000 composite panels. This will provide a new guaranteed roof covering with thermal and fire performance

23rd August 2021

Contract Win in Bedfordshire


Building Type: Manufacturing Size: 2000m2 Brief Project Description:  RoofTech have been awarded the contract to replace this pitched roof covering using new insulated composite panels. This will provide a new

9th August 2021

Contract Win in Middlesex


Location: Middlesex Size: 500m2 Brief Project Description:  RoofTech have been awarded the contract to replace the old asbestos-cement roof covering using insulated composite panels. This will provide a new guaranteed

19th July 2021

Contract Win in North London


Approximate Size: 600m2 Description of Works: Supply and installation of 120mm thick TATA Trisomet insulated composite panels to a new-build frame complete with insulated gutters and smoke vents. back to

5th July 2021

Project Secured – London E6


We are pleased to bring you news of our latest secured project: Location: London E6 Approximate Size: 400m2 Brief Project Description:  RoofTech have been awarded the contract to replace the

12th January 2021

Project Completion – London (Phase 2)


Building type: Education Location: Central London Brief Project Description: Following the successful installation back in the summer of a single ply membrane overlay system to defective pitched metal composite panel

9th November 2020

Project Completed – Hertfordshire


We are pleased to bring you news of a recently completed project: Type of Works: Stairwell and lift shaft extension Location: Hertfordshire Approximate Size: 40m2 to roof and 200m2 to

19th October 2020

Project Completion – London


Building type: Education Location: Central London Brief Project Description: Installation of single ply membrane overlay system to defective pitched metal composite panel covering including manufacturer approved weathering details to vent

7th September 2020